Minutes of the Emergency Meeting of the Board of Directors
of the
|
The meeting was called to order by Mr. Stoner at |
Call to Order |
|
|
|
|
Members Present: Mr. Bill Stoner, President Mr. Tim Owens Mrs. Joycene Tarver, Clerk Mr. Angel Sumaya |
Roll Call |
|
|
|
|
Members Absent:
Mr. Fausto Sanchez |
Absent |
|
|
|
|
Staff Present: Mr. Kenneth R.
Bergevin, Superintendent Mrs.
Mrs.
Debbie L. Hearron, District Secretary |
Staff Present |
|
|
|
|
Others Present: Mr. Bill Melby, Ordiz-Melby Architect;
Ms. Renee Goodwin and Mr. Tom Reid both of Colombo Construction Company. |
Others |
|
|
|
|
Mr. Owens led the Pledge of
Allegiance. |
Pledge of Allegiance |
|
|
|
|
Mr. Bergevin informed the Board
there were no changes to the agenda. |
Adoption of Agenda |
|
|
|
|
Mr. Bergevin introduced Mr.
Melby, Ms. Goodwin and Mr. Reid. Ms. Goodwin led a
discussion explaining the bid process for awarding contracts for the El
Camino Real Elementary School construction project. Bids were received on |
Superintendent’s Report |
|
|
|
|
On motion of Mr. Owens, seconded
by Mr. Sumaya, the board unanimously approved the
BASE + Alternate 2 basis for
determination of low bidder. |
Basis of Determination |
|
|
|
|
Due to the fact that not all the
requested bids were received Mr. Bergevin recommended to the Board to
consider tabling items 3.2 – 3.30 until after the On motion of Mr. Owens, seconded
by Mrs. Tarver, the board unanimously approved to table items 3.2 – 3.30
until after 3.2 3.2 Consider approval of Bid Package
No. 023-00 Earthwork for El Camino Real School. 3.3 Consider
approval of Bid Package No. 025-00 Site Utilities for El Camino Real School. 3.4 Consider
approval of Bid Package No. 027-01 Asphalt Paving for El Camino Real School. 3.5 Consider
approval of Bid Package No. 028-01 On-Site Concrete for El Camino Real
School. 3.6 Consider
approval of Bid Package No. 028-02 Chain Link Fencing for El Camino Real
School. 3.7 Consider
approval of Bid Package No. 028-03 Playground Equipment for El Camino Real
School. 3.8 Consider
approval of Bid Package No. 029-01 Irrigation/Landscape for El Camino Real
School. 3.9 Consider
approval of Bid Package No. 030-01 Structural Concrete for El Camino Real
School. 3.10 Consider
approval of Bid Package No. 042-01 Concrete Masonry Unit for El Camino Real
School. 3.11 Consider
approval of Bid Package No. 051-01 Structural Steel for El Camino Real
School. 3.12 Consider
approval of Bid Package No. 061-01 Rough Carpentry for El Camino Real School. 3.13 Consider
approval of Bid Package No. 062-01 Finish Carpentry for El Camino Real
School. 3.14 Consider
approval of Bid Package No. 064-01 Laminated Plastic Casework for El Camino
Real
School. 3.15 Consider
approval of Bid Package No. 072-01 Insulation for El Camino Real School. 3.16 Consider
approval of Bid Package No. 073-01 Roofing for El Camino Real School. 3.17 Consider
approval of Bid Package No. 074-01 Foam Roofing for El Camino Real School. 3.18 Consider
approval of Bid Package No. 085-01 Aluminum Windows/Glass &
Glazing/Storefront
for El 3.19 Consider
approval of Bid Package No. 092-01 Lath/Plaster/Drywall for El Camino Real
School. 3.20 Consider
approval of Bid Package No. 093-01 Ceramic Tile for El Camino Real School. 3.21 Consider
approval of Bid Package No. 096-01 Resilient Flooring/Carpet for El Camino
Real
School. 3.22 Consider
approval of Bid Package No. 098-01 Acoustical Ceilings/Acoustical Wall
Panels/Vinyl
Covered Tackable Wallboard for El Camino
Real School. 3.23 Consider
approval of Bid Package No. 099-01 Painting/Vinyl Wall Covering for El Camino
Real
School. 3.24 Consider
approval of Bid Package No. 100-01 Architectural Specialties for El Camino
Real
School. 3.25 Consider
approval of Bid Package No. 101-01 Marker Boards/Tack Boards for El Camino
Real School. 3.26 Consider
approval of Bid Package No. 106-01 Operable Partitions for El Camino Real
School. 3.27 Consider
approval of Bid Package No. 110-01 Stage Curtain for El Camino Real School. 3.28 Consider
approval of Bid Package No. 114-01 Food Service Equipment for El Camino Real
School. 3.29 Consider
approval of Bid Package No. 154-01 Plumbing for El Camino Real School. 3.30 Consider
approval of Bid Package No. 158-01 HVAC/Sheet Metal/Direct Digital Control
System for El |
Tabled items |
|
|
|
|
On motion of Mr. Owens, seconded by Mr. Sumaya,
the board unanimously adjourned the meeting at |
Adjournment |